Premium 20.500.12592/t2c628

ad in the form of an agenda for Company Directors

1 Jan 1943

Chairman's Copy Progress Report for a Meeting of the Directors on Co-operation by the Company in the Battle for Fuel. 1. Boiler Plant. Following the survey by the Ministry of Fuel's engineers, instruments have been leaky brickwork made good, damper controls adjusted and made accessible. Foreman and boiler staff are attending the Ministry's local lectures. 2. Process Work. On advice of Trade Association Fuel Effi- ciency Committee: (a) boiling processes are started at staggered intervals; (b) steam supplies to vats are reduced as soon as boiling point is reached.
coal infrastructure surveys employment engineering factories heating industrial equipment industrial production industry gas rationing savings supply vocational training fuel welfare utilities hot water industrial consumption fuel shortages
Collection ID
HATOM
Document Reference
HATOM/2/278
Document Types
Ephemera Report
File Reference
HATOM/2
Identifier
10.1080/wtss.hatom.000002.278
Keywords
Coal Employment Engineering Factories Fuel Fuel Shortages Gas Heating Hot Water Industrial Consumption Industrial Equipment Industrial Production Industry Savings Surveys Vocational Training Welfare
Language
English
Pages
1
Published in
United Kingdom
Series
History of Advertising Trust: O&M wartime book no 2
Themes
Industry Infrastructure Rationing Supply Fuel Utilities

Related Topics

All